Richmond, Romeo & Rochester (RR&R)

Model railroading in all scales and gauges. HO talk welcome :)
GRHC
Railroadfan...fan
Posts: 1981
Joined: Wed Mar 02, 2022 9:32 am

Re: Richmond, Romeo & Rochester (RR&R)

Unread post by GRHC »

AARR wrote:
Mon Apr 04, 2022 8:27 am
GR H & C wrote:
Mon Apr 04, 2022 7:54 am
Once your railroad is up and running how will you operate your trains. Will you use a card order/waybill system or some other technique?
It will have a small enough roster that I will do everything in my head. However, if/when I go to a system it will probably by Card Order.

You have a very nice looking layout. I wish you would create a thread and post more information/pictures of it.

Thank you
I operate my layout in a somewhat/close to pro typical fashion (I am a river counter lol) I have a rudimentary system for operating trains which is in my head.

Maybe someday I’ll get up the nerve to post about it like you did with your RR & R but until then I guess I’ll just give a little glimpses and glimmers of the VPT

User avatar
AARR
Ann Arbor RR Nerd
Posts: 38417
Joined: Wed Dec 22, 2004 7:39 pm
Location: Washington, MI

Re: Richmond, Romeo & Rochester (RR&R)

Unread post by AARR »

DCC is hooked up and one short segment is operable. My friend is coming back in two weeks to work on it again. This is my first experience with engines that have sound and functioning lights. It's exciting!

However, I discovered two of my engines do not have their decoders and I am working on getting them equipped.

I have a 4th engine that is equipped but can't have it until Christmas :) .
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...

User avatar
AARR
Ann Arbor RR Nerd
Posts: 38417
Joined: Wed Dec 22, 2004 7:39 pm
Location: Washington, MI

Re: Richmond, Romeo & Rochester (RR&R)

Unread post by AARR »

Updated pictures. Currently at Plywood Central state.

Letica Plastics/Berry Plastics in Rochester
IMG_7554.jpg

The left side (where the bulkhead flat car is) is Church's Lumber and ACME Building Materials in Auburn Hills and the right side (where the covered hopper is) is Peninsula Plastics in Auburn Hills and Pfizer in Rochester
IMG_7555.jpg

Washington Elevator/Capitol Fertilizer
IMG_7553.jpg

Ford Engine Romeo (Walthers Stamping Plant is on back order)
IMG_7552.jpg

Theut Products Stone Terminal in Romeo
IMG_7551.jpg

Star of the West in Richmond
IMG_7550.jpg

FCA Warehouse in Mt. Clemens
IMG_7548.jpg

LC Stone in Mt. Clemens
IMG_7547.jpg

Carter Lumber in Macomb and engine/caboose track
IMG_7546.jpg

Four track staging yard representing Detroit and Port Huron
IMG_7545.jpg
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...

GRHC
Railroadfan...fan
Posts: 1981
Joined: Wed Mar 02, 2022 9:32 am

Re: Richmond, Romeo & Rochester (RR&R)

Unread post by GRHC »

AARR wrote:
Sun Sep 25, 2022 6:34 pm
Updated pictures. Currently at Plywood Central state.
A lot of nice buildings it looks like your layout is really coming along. I look forward to future updates.

User avatar
AARR
Ann Arbor RR Nerd
Posts: 38417
Joined: Wed Dec 22, 2004 7:39 pm
Location: Washington, MI

Re: Richmond, Romeo & Rochester (RR&R)

Unread post by AARR »

First operating session today. In around 2-2.5 hours accomplished 60-75% of a full session.

I'd give the overall performance an 7 or 8 out of 10.
- I still need to add feeder wires to reduce dead spots. I would estimate there are 15-20 dead spots. My Athearn engines stutter but pass through most of the dead spots but the Rapido dies on most of them.
- I still need to smooth out a few bumps in the tracks to eliminate derailments. Due to low speeds there were only about 10-15 derailments not caused by operator error. There were probably more caused by the operator's errors :oops: .

The trains will line up like this:
- Mt. Clemens Local (GTW) switches the three outside industries using the GP38-2 (and hopefully someday a GP9R)(about 5 cars)
- Richmond Turn (GTW) interchanges with the RRR at Richmond using the GP38-2 (6-11 cars)
- Richmond Turn (RR&R) operates from Romeo to Richmond to exchange cars and switch industries using a GP9 (6-11 cars)
- Auburn Hills Turn operates from Romeo to Auburn Hills switching industries using a SW1200RS (3-5 cars)
- A limestone extra (RRR) will run Romeo to Port Huron as need using the GP38AC

I will post updated photos soon.
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...

User avatar
KVERBERK
Railroadfan...fan
Posts: 577
Joined: Sat Sep 01, 2007 11:55 am
Location: Da U.P.

Re: Richmond, Romeo & Rochester (RR&R)

Unread post by KVERBERK »

Nice that you had an operating session already! I'd like to try operating your layout. I had a couple guys come operate mine for the first time about a week ago and things went pretty well.
Looking forward to more updates.
Up North TSBY/GLC Fan

User avatar
AARR
Ann Arbor RR Nerd
Posts: 38417
Joined: Wed Dec 22, 2004 7:39 pm
Location: Washington, MI

Re: Richmond, Romeo & Rochester (RR&R)

Unread post by AARR »

KVERBERK wrote:
Sun Jan 22, 2023 8:55 pm
Nice that you had an operating session already! I'd like to try operating your layout. I had a couple guys come operate mine for the first time about a week ago and things went pretty well. Looking forward to more updates.
Thank you for your feedback.

At this time, it is set up for one person to operate. In the future I will set it up for two-person operation. But the room will never be able to accommodate more than two people. The board is 6x10 and the room is 9x12 so the aisles are narrow.
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...

User avatar
KVERBERK
Railroadfan...fan
Posts: 577
Joined: Sat Sep 01, 2007 11:55 am
Location: Da U.P.

Re: Richmond, Romeo & Rochester (RR&R)

Unread post by KVERBERK »

At this time, it is set up for one person to operate.
I understand that. When I had two guys running mine it was about all I could accommodate I think with me making 3, and I was just observing. Although in the future I would like to have one or two operating and one acting as a dispatcher.
Up North TSBY/GLC Fan

User avatar
David Collins
Youtube Railfan Guru
Posts: 2914
Joined: Fri Sep 25, 2020 10:46 am
Location: Bloomfield Hills, Mi
Contact:

Re: Richmond, Romeo & Rochester (RR&R)

Unread post by David Collins »

Looks great Don! If I were you, I'd do a card order system for your layout, given how many industries you have.

User avatar
AARR
Ann Arbor RR Nerd
Posts: 38417
Joined: Wed Dec 22, 2004 7:39 pm
Location: Washington, MI

Re: Richmond, Romeo & Rochester (RR&R)

Unread post by AARR »

David Collins wrote:
Tue Jan 24, 2023 6:56 pm
Looks great Don! If I were you, I'd do a card order system for your layout, given how many industries you have.
Thank you for the suggestion. For now I can track everything in my head but as it grows the Card Order System is definitely in consideration.
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...

User avatar
AARR
Ann Arbor RR Nerd
Posts: 38417
Joined: Wed Dec 22, 2004 7:39 pm
Location: Washington, MI

Re: Richmond, Romeo & Rochester (RR&R)

Unread post by AARR »

Updated photos.

The newest kit is the large gray building which represents Ford Romeo Engine Plant. The box cars are loaded inside the building (I kitbashed the opening), the tank car in the unloading shed and scrap aluminum bales are loaded in gondolas next to the tank car shed.

There are still a few track issues to work out although derailments are infrequent due to the slow speeds I operate at. I may leave the imperfections on the branch line and spurs as it adds to operational interest.

I have a one plastic pellet covered hopper car that cannot navigate the inner most branch line curve so it gets staged at the nearest available siding (usually the aggregate siding) and is transloaded there. I suspect real railroads have to figure stuff like that out too.

A full operating session takes well over three hours (possibly four). I haven't had time to do everything in one sitting. I usually go 20-30 minutes at a time and pick up where I left off previously.

There are 50 cars (its all I need) including two cabooses (seldom use them but they look nice). The cars are staged in order so I don't need cards or computer printouts.

I currently have two engines, will be acquiring three more and then I will be done.

I've penciled in the roads, but every time I intend to work on it and landscaping, I end up operating instead.
IMG_8471.jpg
IMG_8470.jpg
IMG_8469.jpg
IMG_8468.jpg
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...

User avatar
DaveO
Read more, think more, post less
Posts: 1481
Joined: Thu Dec 14, 2017 12:57 pm
Location: Between here and there

Re: Richmond, Romeo & Rochester (RR&R)

Unread post by DaveO »

AARR wrote:
Tue Jun 25, 2024 7:12 pm


There are still a few track issues to work out although derailments are infrequent due to the slow speeds I operate at.
Hey, that's my excuse! oh you're talking about train speed. sorry :D

Post Reply