How do you tack/nail your track down?
Posted: Sat Apr 12, 2008 11:45 pm
Hello,
I have a question about Atlas part 2540 (HO/N Track nails). I have a 4x8 HO scale layout using Code 083 Atlas track. I have the track laid on top of Woodland Scenics roadbed. I am debating how to tack the track down now. I bought some small "spikes" that fit in to the holes that are pre-cut in to the ties, but they're way too short to actually do anything. These little spikes are between a quarter and a half of an inch.
I'm thinking about purchasing the nails that Atlas makes (part #2540). I think that they'll be long enough but do you know if they're small enough in diameter to fit in to the two pre-cut holes that each track piece already has cut in the ties? If they're too large to fit in to the holes already cut in the ties, how are they supposed to be used?
Also, when tacking your track down, is the spike/nail supposed to go through the roadbed and go in to the plywood? Or is it just supposed to pierce the roadbed and stay in place that way?
Thanks in advance!
Dante
I have a question about Atlas part 2540 (HO/N Track nails). I have a 4x8 HO scale layout using Code 083 Atlas track. I have the track laid on top of Woodland Scenics roadbed. I am debating how to tack the track down now. I bought some small "spikes" that fit in to the holes that are pre-cut in to the ties, but they're way too short to actually do anything. These little spikes are between a quarter and a half of an inch.
I'm thinking about purchasing the nails that Atlas makes (part #2540). I think that they'll be long enough but do you know if they're small enough in diameter to fit in to the two pre-cut holes that each track piece already has cut in the ties? If they're too large to fit in to the holes already cut in the ties, how are they supposed to be used?
Also, when tacking your track down, is the spike/nail supposed to go through the roadbed and go in to the plywood? Or is it just supposed to pierce the roadbed and stay in place that way?
Thanks in advance!
Dante