Moving a Caboose in the Subway

News or chat about railroad info that pertains to the entire United States, another state, or country.
User avatar
12Bridge
Railroadfan...fan
Posts: 347
Joined: Thu Feb 26, 2009 7:57 pm
Location: Lake Wazapamani

Moving a Caboose in the Subway

Unread post by 12Bridge »

In the next of my Long Island Shenanigans threads...

4 years ago I rode as a Tech Adviser for the movement of Hack C-60 (LI used Hack, not Caboose) from Riverhead (73 miles from NYC), into NYC, where it was going on display at the NYC Transit Museum for the LIRR 175th Anniversary exhibit.

A little history on the car: Built in 1961 by International Car Co. for LI, one of the Flatside N22A series (Cars 56-61), no bay window or cupola. It was Donated to the Twin Forks Chapter, NRHS (group I am with on LI) in 2003, and was restored by them.

Heres the story copied from another forum I had it on back when it happened.

Well, We start out about 6 months ago (Fall of 2008). The NYC Transit Museum museum is interested in an exhibit for the upcoming 175th anniversary of the LIRR. Well, after a few more months of work, the ball really started rolling about February (2009). They want it, and they want it in April. The race is on to finish the darn thing now. We get a date with the FRA inspector who gives us a list of issues to address. We knock them out and are given a clean bill of health. So, after a few more meetings, measurements, etc, the date is set for the 4th. We rush to finish it. Many LONG weekdays and nights were put in, especially the last week, to finish it up. LIRR wants to use 2 MP15s, o7ne on each end. I was surprised to see 3 the night before waiting... Who will take it to Fresh pond to hand off to NYA, who will take it to Linden to hand off to South Brooklyn Railway.

Our adventure begins yesterday morning (April 3rd). I get up at 4:30AM and head over to Ronkonkoma (East end of Electric service on LIRR, home to a small yard). Our power came the night before so I snapped a shot of it in the wee morning hours. I have to pick up somebody and off to Riverhead we go. Turns out they pulled the power off a local work train, hence why we had 3 engines.

Image

We do some final prep work and she is all ready..
Image

Power arrived at about 9am.
Image

Time to drag it out. Some other equipment had to be moved around to get to it.
Image

Image

Putting some of the other stuff back.
Image

no, the Dan's are not crooked. Its the window frame..
Image

Setting up to go West.
Image

LI Extra 170 Set to go west. The original plan was to fly west before the first scoot (Passenger) but that was changed. We are now going west after the first scoot goes East. That was fine, until NYA was in Yaphank dropping off some sand at Arriva. After they cleared up we went west, we finally left around noon. Yours truly and the chapter president were riding as tech adviser's.
Image

(In my post on the LI groups I had a bunch of misc. shots of some of the abandoned spurs we passed, but I will leave those out here)

Reflections.
Image

We had a 15mph speed restriction from the FRA.
Image

Somewhere by Mannorville.
Image

Buff.
http://i291.photobucket.com/albums/ll29 ... 1238964467

Our first major stop was in Ronkonkoma to check the bearings (it still has plain bearing trucks). Mind you, this hack sat for over 10 years. We redid all the bearings, and they didnt give us a hint of trouble.
Image

A platform.
http://i291.photobucket.com/albums/ll29 ... 1238964660

Waiting at Central Islip Station for an Eastbound.
Image

LIRR had there own film crew to document it all, from Riverhead west. They paced us in Pinelawn.
Image

Rounding Divide.
Image

Hicksville.
Image

SRS 128 in Hicksville.
Image

They stuffed us down the Oyster Bay Branch for a few to allow some trains to clear up.
Image

We made Queens by 530 and had a crew change in Hillside.

Morris Park
Image

We made it into Frsh Pond by 8. From here on its dark, And I had no tripod..
Image

Our power in Pond
Image

Sitting in the Wye.
Image

East New York tunnel
Image

Linden Yard interchange track. SBK N1 and N2 were waiting with a rider car.
Image

N2
Image

So how do you move a caboose on the Subway? Very carefully.
Image
We had to use a coupler extension. This thing weighed about 200lbs, and is about 75 years old. It has seen steam.

Into the TA at about 11pm.
Image

Williamsburg Bridge. I am one of 3 people who can say they rode a caboose in the subway, over 2 East River bridges, at 2am.
Image

Coming off the bridge.
Image

Into the tunnels.
Image

Waiting.
Image

..Waiting. Extension cord is for our lights inside.
Image

Waiting for a fresh crew at 38th Street.
Image

Still waiting..
Image

We went from Linden, Up to Manhattan over the Willy B, Down into Brooklyn, Around Coney Island, back up over the Manhattan Bridge and North. All of this thanks to a few track work projects going on in the middle of the night.
We got some interesting looks going through some of the subway stations.

I got off just before they got to 207th Street Yard and hoped on the train back home. I was going on over 24hours..
60 stayed up there for a few days while they added a few safety items before they moved it into the museum.

A week or so after it was in the museum they had a large closed reception party, with all the top MTA officials and the like. Lots of wine and cheese also!

In the museum
Image

Image
Interior. I only wish I got the heater working before we made the trip..

Image
The sign.

The Hack was originally supposed to be on display for a year but it is still there, they kept renewing the loan, as they like it there, but hey, its inside in a protected museum, what every group could only wish for.
There is a handful of other photos here of it: http://www.flickr.com/photos/12bridge/s ... 291056719/
Here is Twin Forks page on it with restoration photos: http://www.twinforksnrhs.org/C-60_1.html

User avatar
Standard Railfan
Railroadfan...fan
Posts: 1816
Joined: Wed Jan 18, 2012 7:25 pm
Location: Marquette, MI

Re: Moving a Caboose in the Subway

Unread post by Standard Railfan »

NICE! :D

adams_aj
Railroadfan...fan
Posts: 74
Joined: Tue Apr 26, 2011 3:04 pm

Re: Moving a Caboose in the Subway

Unread post by adams_aj »

Great post and pictures. Thanks for sharing. Keep it coming! More!

User avatar
Proto48Patrick
Railroadfan...fan
Posts: 201
Joined: Sun Apr 24, 2011 12:06 pm
Location: Kalamazoo

Re: Moving a Caboose in the Subway

Unread post by Proto48Patrick »

great story!

Can you tell me why the 3 MP switchers had handrails that didn't come down to a normal length?

Thanks!
Patrick Welch

User avatar
12Bridge
Railroadfan...fan
Posts: 347
Joined: Thu Feb 26, 2009 7:57 pm
Location: Lake Wazapamani

Re: Moving a Caboose in the Subway

Unread post by 12Bridge »

Thanks..

The reasoning for the half height rails was for additional clearances in raised platform territory. The GP38s, MP15s and SW1001s all had this. There is also a few other things on them for restricted clearances. EMD's angled filter box on the GP series? You can thank LIRR for that..

User avatar
Proto48Patrick
Railroadfan...fan
Posts: 201
Joined: Sun Apr 24, 2011 12:06 pm
Location: Kalamazoo

Re: Moving a Caboose in the Subway

Unread post by Proto48Patrick »

wow, thanks for the info!
Patrick Welch

User avatar
M.D.Bentley
Railroadfan...fan
Posts: 2475
Joined: Sat May 07, 2005 4:41 pm
Location: Downriver

Re: Moving a Caboose in the Subway

Unread post by M.D.Bentley »

Your guys should be proud of what have accomplished . Looks great.

Post Reply