I&O Delta working southbound today
-
- Railroadfan...fan
- Posts: 1611
- Joined: Mon Mar 20, 2006 1:43 pm
- Location: Perrysburg Ohio
I&O Delta working southbound today
By Hamler at 11 AM Tunnel motor 4072 with two covered hoppers of plastic pellets.
- AARR
- Incognito and Irrelevant
- Posts: 38614
- Joined: Wed Dec 22, 2004 7:39 pm
- Location: Washington, MI
Re: I&O Delta working southbound today
Maybe a hot load to operate with just 2 cars or there's something in Lima that urgently needs to bring north. Or maybe it's just a regularly scheduled day and that's all there is to carry.
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...
- railohio
- Photographer of Wires in America by Rail of Ohio & Wisconsin
- Posts: 1789
- Joined: Fri Mar 13, 2009 7:44 pm
- Location: Wisconsin
- Contact:
Re: I&O Delta working southbound today
I think they're the first two cars for Silgan in Ottawa.
"I shot the freight train / But I did not shoot the fantrip"
-
- Railroadfan...fan
- Posts: 2097
- Joined: Tue Jun 30, 2009 10:10 pm
Re: I&O Delta working southbound today
Just about every assignment for the I&O is back on six days a week if there's work to be done.
Re: I&O Delta working southbound today
They're working in Leipsic, then going to Silgan in Ottawa. Then back to Delta to work Northstar and Fulton County, if they haven't already.
Bottom text.
-
- i don't give a fark about your PM
- Posts: 3538
- Joined: Mon Sep 12, 2005 11:44 am
- Location: Columbus Ohio
- Contact:
Re: I&O Delta working southbound today
So the spur to Silgan is in place and functional...hope it works out well for Silgan and IORY. Since they came from the north, were the covered hoppers interchanged with IORY at Delta by NS, Diann? or did they come from Flat Rock Yard?
Exit stage left
- AARR
- Incognito and Irrelevant
- Posts: 38614
- Joined: Wed Dec 22, 2004 7:39 pm
- Location: Washington, MI
Re: I&O Delta working southbound today
Their spur went in darn fast. It was only a few months ago the funds were approved. According to mapquest the plant is several blocks away from the main but I'm presuming that mistaken and it's right along the main with only a short spur track required. Can anyone confirm this? Thanks guys.railohio wrote:I think they're the first two cars for Silgan in Ottawa.
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...
-
- Railroadfan...fan
- Posts: 2097
- Joined: Tue Jun 30, 2009 10:10 pm
Re: I&O Delta working southbound today
Those ORDC grants for tracks work and spurs for industrial development are typically "shovel" ready and the money is transferred usually the day of the meeting. Putting America to work....
Re: I&O Delta working southbound today
Not sure, but prolly from the Rock.redside20 wrote:So the spur to Silgan is in place and functional...hope it works out well for Silgan and IORY. Since they came from the north, were the covered hoppers interchanged with IORY at Delta by NS, Diann? or did they come from Flat Rock Yard?
Bottom text.
-
- Railroadfan...fan
- Posts: 66
- Joined: Wed Nov 24, 2010 4:53 pm
Re: I&O Delta working southbound today
I don't know which way the switch faces to the new spur, but the same consist came through Columbus Grove southbound. I don't know if they ran around them there so that they could shove them into the spur, or if the cars were not for Ottawa after all.railohio wrote:I think they're the first two cars for Silgan in Ottawa.
The B&O mainline through Ohio- the "diamond route"