Page 1 of 2

Q108 and Q109

Posted: Fri Dec 07, 2012 3:11 pm
by JoJames
Northeast transfer at Ridgeway will be complete for use early next week with handthrow switches. New trains Q108 and Q109 will operate Marion to North Baltimore. Q106 and Q107 Will return to being St Louis to Marion trains on CSX.

Re: Q108 and Q109

Posted: Fri Dec 07, 2012 3:34 pm
by cbehr91
They really built that in a hurry! Any idea when the last 106/107 will operate via Galatea/Fostoria?

Re: Q108 and Q109

Posted: Fri Dec 07, 2012 3:49 pm
by JoJames
cbehr91 wrote:They really built that in a hurry! Any idea when the last 106/107 will operate via Galatea/Fostoria?
May have been today. Its scheduled to be in service Monday as the ballast is getting dumped Saturday and surfacing work will be done over weekend. Not sure if 106 and 107 will operate to North Baltimore over the weekend

Re: Q108 and Q109

Posted: Mon Dec 10, 2012 9:44 pm
by CSX Q109
Well a guy that I know got pics of a Q106 with KCS power sunday in fostoria. So Iam guessing that was the last 106 to run fostoria.

Re: Q108 and Q109

Posted: Mon Dec 10, 2012 10:13 pm
by Y@
I believe both trains ran their "usual" way today, and are profiled to do it again tomorrow. May be the end of the week before Q108 and Q109 actually begin.

Re: Q108 and Q109

Posted: Tue Dec 11, 2012 8:24 am
by JoJames
Y@ wrote:I believe both trains ran their "usual" way today, and are profiled to do it again tomorrow. May be the end of the week before Q108 and Q109 actually begin.
Had problems getting ballast dumped over weekend. It will likely be mid week or end of week till 108 and 109 begin.

Re: Q108 and Q109

Posted: Mon Dec 31, 2012 8:32 pm
by Y@
Less than a month left until Q106/107 go back to their old routing. Here's the final Q106 of 2012 at Crawford today.

http://www.flickr.com/photos/Y@_heilman/8331998046/

Re: Q108 and Q109

Posted: Tue Jan 01, 2013 4:30 am
by Huelsy'sTrainBlog
Y@ wrote:Less than a month left until Q106/107 go back to their old routing. Here's the final Q106 of 2012 at Crawford today.

http://www.flickr.com/photos/Y@_heilman/8331998046/
Great shot Y@

Re: Q108 and Q109

Posted: Tue Jan 01, 2013 11:24 am
by ssnk79

Re: Q108 and Q109

Posted: Tue Jan 01, 2013 4:13 pm
by CSX Q109
I also got 106 in fostoria. Heres mine. Image
fostoria trains dec 31-2012 064 by CSX/UP DUDE, on Flickr

Re: Q108 and Q109

Posted: Wed Jan 02, 2013 6:59 am
by CG Tower
Myself and our son, along with Y@ and others all converged on Fostoria to chase Q106 down the C&O, we had a good time and was able to get a few shots as well:

1) Q106 heads east out of Fostoria past the East End of the Fostoria Center Siding.
http://www.flickr.com/photos/cgtower/8331829496/

2) Believe it or not, we were able to catch up to the train again at Carey:

http://www.flickr.com/photos/cgtower/8331829124/

3) Finally, through complete dumb luck, Q106 stopped and cooled its heels just west of the US 30 signal in Upper Sandusky, apparently SA Tower was occupied by a CF&E train! Talk about timing. After the CF&E man clears, Q106 stomps out of Upper in the midst of a snow squall.

http://www.flickr.com/photos/cgtower/8331829306/

Enjoy,

CG Tower

Re: Q108 and Q109

Posted: Mon Jan 07, 2013 12:35 pm
by CSX_CO
Q106-07 *should* be the first train to operate direct to Marion. Appears to have a 1900 scheduled arrival time at Marion. Nothing on Q108/109 as of this morning, but they might pop in today as the profiles are activated.

Practice Safe CSX

Re: Q108 and Q109

Posted: Mon Jan 07, 2013 1:07 pm
by CG Tower
I had heard that the full plan was not being implemented until 1/21/13. Has there been a change?

CG Tower

Re: Q108 and Q109

Posted: Mon Jan 07, 2013 1:25 pm
by CSX_CO
Profile is back to NWO again, so someone may have jumped the gun a bit. That, or the system still thought the changes were going to take effect as originally planned on the 7th and 8th.

So you can keep your Taco Bells for another 2 weeks.

Practice Safe CSX

Re: Q108 and Q109

Posted: Mon Jan 07, 2013 1:32 pm
by CG Tower
Yes, but it's CSX....so, tomorrow they me decide to abandon the whole Toledo branch. ;)

E at CG

Re: Q108 and Q109

Posted: Mon Jan 07, 2013 9:12 pm
by Y@
Q106-07 ran the C&O today... So yes, someone jumped the gun.

Re: Q108 and Q109

Posted: Sun Jan 27, 2013 11:02 pm
by CSX_CO
Looks like 2/11 is the target date now for the change to a Q109 turn out of Marion. 2/1 us the projected date the n/e eye will be put in service.

Practice Safe CSX

Re: Q108 and Q109

Posted: Mon Jan 28, 2013 9:51 am
by MSchwiebert
http://www.marionstar.com/article/20130 ... ued-growth

Didn't realize that there's now a loop track at the Marion Intermodal site?

Re: Q108 and Q109

Posted: Mon Jan 28, 2013 12:59 pm
by CSX_CO
MSchwiebert wrote:http://www.marionstar.com/article/20130 ... ued-growth

Didn't realize that there's now a loop track at the Marion Intermodal site?
That was mention in the email to the Unions I saw. I was surprised too. I thought it meant they were putting a switch out of the east end, not that they'd built an entire loop! IIRC there used to be a east switch into MED off the Indy Line. ROW with rails was still out there, but it was in a woods. I guess that means no more backing into MED for Q106. I wonder if that means they'll be using the KCS power to run the NWO block out of Marion then? Pull in, make the cut on NWO and right back in from whence you came.

Practice Safe CSX

Re: Q108 and Q109

Posted: Mon Jan 28, 2013 1:31 pm
by cbehr91
That's interesting, because the "preferred" way to get 106 into the yard is to have the train pull down to CP 105 and have the power run around the train so they don't have to back the train through town. I would have to imagine 107's departure is orchestrated much the same way, but I've never personally seen it.