@Raildudesdad, the problem up there is the freeze, snow or rain or just condensation from the warm pellets can freeze lumps of load to the car side, even with vibration.
Remember to derailments on the Conrail in Detroit at Rouge? Frozen coal!

Raildudes dad
Roadmaster
Posts: 4761
Joined: Fri Dec 23, 2005 9:12 am
Location: Grand Rapids, MI

Re: New Coal Movement for LS&I in UP

Unread post by Raildudes dad »

M&LS wrote:@Raildudesdad, the problem up there is the freeze, snow or rain or just condensation from the warm pellets can freeze lumps of load to the car side, even with vibration.
Remember to derailments on the Conrail in Detroit at Rouge? Frozen coal!
I guess I "assumed" that when the boats were not running, they would not be hauling pellets downhill or coal uphill. The rest of the year, they would have to watch for frozen loads and handle it accordingly. Port Sheldon gets coal loads daily throughout the winter so I know they have to deal wiith frozen loads.

M&LS
Railroadfan...fan
Posts: 59
Joined: Mon Sep 20, 2010 9:20 pm
Location: Lansing, MI

Re: New Coal Movement for LS&I in UP

Unread post by M&LS »

@ raildudesdad, I think you assumed correctly, I would think the same thing. I don't know if they ship by rail(exclusively) in the winter... I'll have to ask a friend who follows the LS&I. Does anyone on here know?

i995impalass
Yooper Foamer
Posts: 1527
Joined: Wed Aug 30, 2006 12:00 am
Location: Marquette, MI

Re: New Coal Movement for LS&I in UP

Unread post by i995impalass »

The coal was railed in with the LS&I 1000 hoppers (now on the Algoma all rail/ 7 Weigher) from West Yard 15 years before I started. The coal was brought in by ship to the power plant transloaded. At the Tilden clay shed #10 track is the coal track to the dumper and at the Empire track #5 was still in place to the coal building. My days working there (08) Blaundo was hauling right in into the same dumpers and the tracks were still in. Down at West Yard on the inbound lead, the coal track was still in an gated closed for the power plant.

LS&I during the off season is yes slower, but not shut down. They have the Weigher running all year round, and yard jobs running to switch the shops. Remember those ore cars are in a heavy yearly FRA program totally torn down and looked over and don't skip inspection months. If busy enough Algoma will send their boats around this time (March), since they do not have to go past the locks. This means a dock, hill, and a Tilden might be running. Also a some jobs might be combined depending on the work load- Dock/ Hill, Yard/ Tilden.

muskegonrr
Railroadfan...fan
Posts: 65
Joined: Thu Sep 08, 2005 11:26 am
Location: Heritage Landing
Contact:

Re: New Coal Movement for LS&I in UP

Unread post by muskegonrr »

People still live in the UP?