Anything pertaining to railfanning in Michigan.
chapmaja
Railroadfan...fan
Posts: 1471
Joined: Sat Nov 22, 2008 2:02 pm

GLC Pipe Loads

Unread post by chapmaja »

Recently, as in the last few times I've gone towards Durand, I have noticed loads of pipes at Oak Grove along the GLC. I also noticed several cars in the Durand yard as well. I assume these cars are being handed off to the GLC from CN (via the HESR) and then are hauled down to Oak Grove for unloading. The field next to the tracks is loaded with pipes.

Does anyone know what project this is that is going on?

User avatar
GP9R
Railroadfan...fan
Posts: 1065
Joined: Sat Mar 17, 2007 9:01 pm
Location: Michigan

Re: GLC Pipe Loads

Unread post by GP9R »

Enbridge is rebuilding their pipeline. And you are correct about the pipes coming from the CN

GAP
Railroadfan...fan
Posts: 244
Joined: Tue Mar 14, 2006 9:06 pm
Location: Portage MI

Re: GLC Pipe Loads

Unread post by GAP »

I've heard that pipe for this project will also be staged in the CN Kilgore Yard in Kalamazoo.

User avatar
SD80MAC
Ingersoll's Mr. Michigan
Posts: 10658
Joined: Thu Mar 10, 2005 4:59 pm
Location: Grand Rapids

Re: GLC Pipe Loads

Unread post by SD80MAC »

GAP wrote:I've heard that pipe for this project will also be staged in the CN Kilgore Yard in Kalamazoo.
Indeed, that's one of the reasons CN is re-opening Kilgore as a "base" and the Kzoo job will start going on duty there.
"Remember, 4 mph is a couple, 5's a collision!"
http://flickriver.com/photos/conrail680 ... teresting/
Image