Jackson-Lansing Railroad

Anything pertaining to railfanning in Michigan.
GTWFRED
Railroadfan...fan
Posts: 332
Joined: Tue Jan 13, 2009 12:47 pm

Re: Jackson-Lansing Railroad

Unread post by GTWFRED »

Buster Manning wrote: I forget the name of this yard and in the photo there is a DWP car sitting on the interchange, which seems to be the majority of what is interchanged here--CN family box cars and bulk-head lumber flats--that I have seen thru the years of going by here.
Saginaw yard at what used to be two OLDS plants, now torn down.

OwlCaboose2853
Railroadfan...fan
Posts: 2176
Joined: Fri Dec 17, 2004 9:17 pm
Location: Chelsea

Re: Jackson-Lansing Railroad

Unread post by OwlCaboose2853 »

GTWFRED wrote:
Buster Manning wrote: I forget the name of this yard and in the photo there is a DWP car sitting on the interchange, which seems to be the majority of what is interchanged here--CN family box cars and bulk-head lumber flats--that I have seen thru the years of going by here.
Saginaw yard at what used to be two OLDS plants, now torn down.
Hey GTWFRED, Thank you.
Amtrak Wolverines
NS Michigan Lines
Ann Arbor RR
The Monorail Society

Steven R. Williams

User avatar
Scooterb
Sofa King Grumpy
Posts: 4591
Joined: Tue Oct 12, 2004 9:26 pm
Location: Jackson

Re: Jackson-Lansing Railroad

Unread post by Scooterb »

Ok where it that auto max thread about the rolling prisons :).

User avatar
Hogger1225
Railroadfan...fan
Posts: 438
Joined: Sat Aug 27, 2005 9:02 am
Location: St. Johns, MI.
Contact:

Re: Jackson-Lansing Railroad

Unread post by Hogger1225 »

The "yard" that NS & CN interchanged at is called the New Hollow Yard.
I used to get paid for doing what all of you like to watch!

DLM
Railroadfan...fan
Posts: 238
Joined: Mon Nov 21, 2005 4:33 pm
Location: Grand Rapids, MI

Re: Jackson-Lansing Railroad

Unread post by DLM »

All this speculation on the GP-9's going to JAIL. Couldn't they lease power from the NS until they can figure out what they need? I seem to recall other startup railroads have done this.

User avatar
SD80MAC
Ingersoll's Mr. Michigan
Posts: 10586
Joined: Thu Mar 10, 2005 4:59 pm
Location: Grand Rapids

Re: Jackson-Lansing Railroad

Unread post by SD80MAC »

DLM wrote:All this speculation on the GP-9's going to JAIL. Couldn't they lease power from the NS until they can figure out what they need? I seem to recall other startup railroads have done this.
Indeed, I seem to recall during the first week or so of Grand Elk operations they were using the normal NS 36E/37E power from Elkhart to GR and back until they got their units up and running.
"Remember, 4 mph is a couple, 5's a collision!"
http://flickriver.com/photos/conrail680 ... teresting/
Image

GTWFRED
Railroadfan...fan
Posts: 332
Joined: Tue Jan 13, 2009 12:47 pm

Re: Jackson-Lansing Railroad

Unread post by GTWFRED »

Hogger1225 wrote:The "yard" that NS & CN interchanged at is called the New Hollow Yard.
OwlCaboose: Hogger1225 is right "new hollow yard" just north of the CN main. I was thinking of NS's Saginaw yard 2 miles north of there. Sorry man!
Fred :?

User avatar
Ben Higdon
Railroadfan...fan
Posts: 844
Joined: Wed Jan 25, 2006 2:02 pm

Re: Jackson-Lansing Railroad

Unread post by Ben Higdon »

Buster Manning wrote:I wonder what the A&B had to give NS for the rights to interchange with CSX?
I don't see anything regarding interchange in the document. There is mention of trackage rights with CSX, and reference to an agreement between CSX and Conrail in 1995. This must be referring to when CSX bought the Lansing Branch from MA to North Lansing, and Conrail was given trackage rights over it (reversing their roles from prior to the sale). JAIL will need to make use of the trackage rights agreement to reach Saginaw Yard.

I'm curious if interchange with CN and CSX will be allowed. I'm sure NS would prefer not, but perhaps the STB would require it as terms of the lease?

Buster Manning
Railroadfan...fan
Posts: 680
Joined: Tue Aug 25, 2009 10:16 pm

Re: Jackson-Lansing Railroad

Unread post by Buster Manning »

The way I read the agreement is that while interchange with CSX is allowed, it would be more lucrative to interchange with NS.

User avatar
Ben Higdon
Railroadfan...fan
Posts: 844
Joined: Wed Jan 25, 2006 2:02 pm

Re: Jackson-Lansing Railroad

Unread post by Ben Higdon »

You're right Buster, my apologies. I missed the document that mentions interchange with CSX. There is also reference to a 1980 interchange agreement between GTW and CR, so hopefully that will be carried over too. I was mistaken too with the joint trackage arrangement in Lansing, apparently CSX is leasing the main between MA and North Lansing.

User avatar
thomas
Railroadfan...fan
Posts: 304
Joined: Fri Mar 17, 2006 11:43 am

Re: Jackson-Lansing Railroad

Unread post by thomas »

what kind of condition is the roadbed in, basiclly like a 10 mph branch, or has ns spent any money on upgrading before dumping it, and this is piece #2, of the original plan for ns to dump most of the mid and west portions of michigan, to watco..
just a thought

User avatar
AARR
Ann Arbor RR Nerd
Posts: 38457
Joined: Wed Dec 22, 2004 7:39 pm
Location: Washington, MI

Re: Jackson-Lansing Railroad

Unread post by AARR »

thomas wrote:what kind of condition is the roadbed in, basiclly like a 10 mph branch, or has ns spent any money on upgrading before dumping it, and this is piece #2, of the original plan for ns to dump most of the mid and west portions of michigan, to watco..
just a thought
My understnading is NS has done minimal maintenance, no capital improvements, and it's a 10mph line.
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...

User avatar
tsinoms
Adult Gerber Baby
Posts: 1661
Joined: Thu Jul 13, 2006 3:56 pm
Location: Grand Rapids, MI
Contact:

Re: Jackson-Lansing Railroad

Unread post by tsinoms »

AARR wrote:
thomas wrote:what kind of condition is the roadbed in, basiclly like a 10 mph branch, or has ns spent any money on upgrading before dumping it, and this is piece #2, of the original plan for ns to dump most of the mid and west portions of michigan, to watco..
just a thought
My understnading is NS has done minimal maintenance, no capital improvements, and it's a 10mph line.
Well wasn't that true when Grand Elk got the line between K-Zoo and GR? IIRC they were smarter than NS and got it back up to 25 like it should be.
Hope they do get some of the GP9's. Would love to see an all GP9 consist out of lansing.
This is my life. There are many like it, but this one is mine.

If this is a problem get used to it.

User avatar
Hogger1225
Railroadfan...fan
Posts: 438
Joined: Sat Aug 27, 2005 9:02 am
Location: St. Johns, MI.
Contact:

Re: Jackson-Lansing Railroad

Unread post by Hogger1225 »

NS only did whatever maintenance that was necessary to keep the trains rolling, nothing more. Entire secondary has been 10 mph for at least 4 years. Last stretch of 25 was between Aurelius Rd and Holt Rd. I was still working the night job, B-28 when it all went to 10. The track between MA and North Lansing was taken over by the CSX, they maintain the track and maintain the signals. Shortly after they took ownership of the "Miracle Mile" they removed one of the mains, really wasn't any reason to have kept both.
I used to get paid for doing what all of you like to watch!

CAT345C
RedNeck Train Chaser
Posts: 4142
Joined: Sat Jul 30, 2005 8:42 pm
Location: Buffalo Location
Contact:

Re: Jackson-Lansing Railroad

Unread post by CAT345C »

Having only seen the line once and from I96 all of the other times, I seem to think that the road bed itself was in good shape. I would imagine they just didn't do a lot of tie work and that would be the reason it is down to 10mph. The way things play out will be interesting, as the Adrian and Blissfield now owns the most short lines in the state. Hopefully they can bring some good business to the line.
Making the railroad all Catywompus since 2008

https://www.flickr.com/gp/66353741@N07/02EZ1e

chapmaja
Railroadfan...fan
Posts: 1375
Joined: Sat Nov 22, 2008 2:02 pm

Re: Jackson-Lansing Railroad

Unread post by chapmaja »

Hogger1225 wrote:NS only did whatever maintenance that was necessary to keep the trains rolling, nothing more. Entire secondary has been 10 mph for at least 4 years. Last stretch of 25 was between Aurelius Rd and Holt Rd. I was still working the night job, B-28 when it all went to 10. The track between MA and North Lansing was taken over by the CSX, they maintain the track and maintain the signals. Shortly after they took ownership of the "Miracle Mile" they removed one of the mains, really wasn't any reason to have kept both.

When was this line taken over my CSX? Was this takeover a lease of purchase. The reason I ask is that the STB filings seem to indicated that the line is still owned by NS via Conrail but is on lease to CSX. I agree it makes no sense to have both mains in place there. I'm actually a little shocked CSX hasn't just purchased it if it is still leased.

My question is what was the track arangement prior to this "lease" that I think occurred. Where did C&O/ Chessie run and where did the Penn Central run at that point? Why was the trackage consolidated?

User avatar
Ben Higdon
Railroadfan...fan
Posts: 844
Joined: Wed Jan 25, 2006 2:02 pm

Re: Jackson-Lansing Railroad

Unread post by Ben Higdon »

One of the documents cites a Pere Marquette/Michigan Central agreement dating to something like 1923. I don't know if they had parallel mains up until that point, or if the agreement dated back farther than that. At any rate it ended up that the C&O had trackage rights over the section of the NYC/PC/CR Saginaw Branch between MA and North Lansing. Both locations had towers, with MA remaining active until the mid 80s-ish. At some point (1980ish) Conrail renamed the track from Saginaw Branch/Secondary to the Lansing Branch/Secondary. As late as 1994 the line from Jackson to MA was the Lansing Secondary, and from MA to North Lansing it was the Lansing Branch. As I understand it the joint section with CSX was termed a "Branch" because the signals were directly controlled by the Conrail dispatcher.

User avatar
Clay320
Railroadfan...fan
Posts: 373
Joined: Thu Apr 22, 2010 6:37 pm
Location: Deerfield MI

Re: Jackson-Lansing Railroad

Unread post by Clay320 »

All GP9s are still on the A&B line as of today (Sept 30).

Anyone hear anything new?

User avatar
AC60CW
Railroadfan...fan
Posts: 697
Joined: Tue Jun 15, 2010 2:18 pm
Location: NW Ohio
Contact:

Re: Jackson-Lansing Railroad

Unread post by AC60CW »

I haven't eheard anything. I think most would lean toward NS still loaning them power or leasing one.
Avatar image use with permission of Elmo Bass http://elmo.rrpicturearchives.net/

M&LS
Railroadfan...fan
Posts: 59
Joined: Mon Sep 20, 2010 9:20 pm
Location: Lansing, MI

Re: Jackson-Lansing Railroad

Unread post by M&LS »

I don't think we'll see anything yet as they have until the 16th to start operations. ADBF may lease power from NS as most (what would now be interchange) traffic at this point is coming north from NS via Jackson...
I don't think that given the patterns of operations that they will base locomotive units out of Lansing, unless they radically restructure things.
Though I sorely wish they would both base out of Lansing and use ADBF power.

Locked