ADBF operating schedule
ADBF operating schedule
Does anyone know the Adiran and Blissfield's operation schedule? They list their dinner trains online but not their frieght schedule.
Thanks.
Thanks.
- railohio
- Photographer of Wires in America by Rail of Ohio & Wisconsin
- Posts: 1789
- Joined: Fri Mar 13, 2009 7:44 pm
- Location: Wisconsin
- Contact:
Re: ADBF operating schedule
Freight trains operate as-needed, usually on weekdays.
"I shot the freight train / But I did not shoot the fantrip"
Re: ADBF operating schedule
Thanks railohio.
Do you know roughly when during the day they run?
Do you know roughly when during the day they run?
-
- Railroadfan...fan
- Posts: 94
- Joined: Sun Feb 22, 2009 1:54 am
Re: ADBF operating schedule
Some time after 8am till they are done or the hogs catch up to them.
-
- Railroadfan...fan
- Posts: 177
- Joined: Mon Feb 26, 2007 9:21 pm
Re: ADBF operating schedule
Havent you guy's heard? The A&B shut down because the chief mechanic is in Manistee trying to keep the MQT running. Not having much luck though, SD40-2s are slightly larger than a GE 44 tonner.
Bill
Re: ADBF operating schedule
I hope he has time to update the website
-
- Railroadfan...fan
- Posts: 94
- Joined: Sun Feb 22, 2009 1:54 am
Re: ADBF operating schedule
They didnt shout down, they are just saving money so they can put the track back in to Hillsdale, buy the INER and MSO and connect with you guys via trackage rights on Grand Elk.
- AARR
- Incognito and Irrelevant
- Posts: 39021
- Joined: Wed Dec 22, 2004 7:39 pm
- Location: Washington, MI
Re: ADBF operating schedule
And reopen the lines to Clinton and MorenciCamasChris wrote:They didnt shout down, they are just saving money so they can put the track back in to Hillsdale, buy the INER and MSO and connect with you guys via trackage rights on Grand Elk.
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...
Re: ADBF operating schedule
And put track back in through Ottawa Lake so they can connect with NS down in Toledo.AARR wrote:And reopen the lines to Clinton and MorenciCamasChris wrote:They didnt shout down, they are just saving money so they can put the track back in to Hillsdale, buy the INER and MSO and connect with you guys via trackage rights on Grand Elk.
-
- Railroadfan...fan
- Posts: 151
- Joined: Fri May 02, 2008 5:16 pm
Re: ADBF operating schedule
And let me guess, they are also going to put track in going up to Mackinac City and build a rail bridge over the Straights of Mackinac too, huh?
-
- Railroadfan...fan
- Posts: 151
- Joined: Fri May 02, 2008 5:16 pm