New MDOT Rail Plan

Anything pertaining to railfanning in Michigan.
jimnorthwood
Railroadfan...fan
Posts: 415
Joined: Tue Jun 24, 2008 8:05 am
Location: Northwood, OH

New MDOT Rail Plan

Unread post by jimnorthwood »

I didn't look at every link, but one long-term goal that caught my eye was to move the A&B interchange point from Adrian, to Toledo. I suspect this would involve the restoration of trackage from Riga to Ottawa Lake, with A&B to get trackage rights into Airline Yard. Interesting...

http://www.michigan.gov/mdot/0,1607,7-1 ... --,00.html

TrainWatcher
The Beast
Posts: 5934
Joined: Fri Dec 08, 2006 1:28 pm

Re: New MDOT Rail Plan

Unread post by TrainWatcher »

Some of the projects listed are definately interesting under "List of Projects- Tech Memo #3".
TC-Petosky Intercity rail...
GLC track rebuilding...
LSRC Signalling for dark territory...
HESR MoW center and swing bridge rebuilding...

and like you said... the ABDF wanting trackage to Toledo.

User avatar
Saturnalia
Authority on Cat
Posts: 15451
Joined: Wed Sep 28, 2011 7:54 pm
Location: Michigan City, IN
Contact:

Re: New MDOT Rail Plan

Unread post by Saturnalia »

I'm going to assume the dark territory upgrades on LSRC wouldnt include the HURON SUB....anyone confirm that?
Some interesting stuff for sure.......see that there are a few infer structure upgrades for MQT, including a few bridges. wonder how much will actually happen.....doubt much will unless it's already in the budget. also, I noticed there was something about rerouting the PM (371, 370) through Kzoo, hmmm....
Thornapple River Rail Series - YouTube
Safety today is your investment for tomorrow

CSX_CO
Over and Out
Posts: 3434
Joined: Sat Apr 09, 2005 10:34 pm
Location: Indiana
Contact:

Re: New MDOT Rail Plan

Unread post by CSX_CO »

If its anything like Indiana's it plays out like a fantasy list. Amongst Indiana's plan was reinstallation of the Monon from Medaryville to Michigan City for a new route for Southern Indiana Coal. Good luck on THAT one, parts of that railroad have been gone for probably 20+ years now.

Practice Safe CSX

atrainguy60
Saginaw Sub Foamer
Posts: 4099
Joined: Sun Oct 30, 2011 1:54 pm
Location: None of your business......

Re: New MDOT Rail Plan

Unread post by atrainguy60 »

Interesting, but isn't there some kind of building in Ottawa Lake that is right on the old trackage that the ADBF would run to get to Toledo?

User avatar
Clay320
Railroadfan...fan
Posts: 373
Joined: Thu Apr 22, 2010 6:37 pm
Location: Deerfield MI

Re: New MDOT Rail Plan

Unread post by Clay320 »

From google maps it looks like there's room to go around it to the west, kinda like LSRC did with that walmart...

User avatar
LSRC
Flat River Rat
Posts: 1271
Joined: Wed Apr 26, 2006 5:08 pm
Location: Grand Rapids

Re: New MDOT Rail Plan

Unread post by LSRC »

I'm going to assume the dark territory upgrades on LSRC wouldnt include the HURON SUB....anyone confirm that?
I would say that the "plan" is to signal the whole Lake State, as it's all dark territory. Here's the exact quote:
Signalize dark territory to enhance operational efficiency and safety
I don't know why they want to do this. The Lake State operates just fine without signaling. It's not like they're running 8 trains a day against each other. I can understand getting money to fix things like bridges, but the idea of signals on the Lake State is stupid.



This thing on the Grand Elk got me perplexed. I didn't think the condition of the line was THAT bad.
Line was recentlyileased froim a Class 1 operator and is in very poor condition; failure to undertake project immediately could result in the line being removed from service, shippers losing rail access, and

User avatar
cnw8835
Grain Train Fetish LOLZ
Posts: 4736
Joined: Sun Oct 29, 2006 6:19 pm
Location: Grand Rapids, MI
Contact:

Re: New MDOT Rail Plan

Unread post by cnw8835 »

LSRC wrote:
I'm going to assume the dark territory upgrades on LSRC wouldnt include the HURON SUB....anyone confirm that?
I would say that the "plan" is to signal the whole Lake State, as it's all dark territory. Here's the exact quote:
Signalize dark territory to enhance operational efficiency and safety
I don't know why they want to do this. The Lake State operates just fine without signaling. It's not like they're running 8 trains a day against each other. I can understand getting money to fix things like bridges, but the idea of signals on the Lake State is stupid.
Agreed, beyond stupid to signal the Huron Sub. Hopefully they are only talking about the Saginaw/Bay City areas that don't have signals already.


This thing on the Grand Elk got me perplexed. I didn't think the condition of the line was THAT bad.
Line was recently leased from a Class 1 operator and is in very poor condition; failure to undertake project immediately could result in the line being removed from service, shippers losing rail access, and
It was mostly 10mph from Kzoo-GR when GDLK took over. They have already been replacing some ties and most of it is now 25mph but from what I've heard quite a bit of the line north of Kzoo still needs. "failure to undertake project immediately could result in the line being removed from service"... I'm not so sure about that though.

Buster Manning
Railroadfan...fan
Posts: 688
Joined: Tue Aug 25, 2009 10:16 pm

Re: New MDOT Rail Plan

Unread post by Buster Manning »

Sounds like the same plan they used out in Washington....

KenB
Railroadfan...fan
Posts: 1505
Joined: Mon Apr 16, 2007 1:43 pm
Location: Dearborn, Mich.

Re: New MDOT Rail Plan

Unread post by KenB »

Re-routing Amtrak from Grand Rapids to Kalamazoo thence to Chicago would be a very bad idea. Add a lot of time to the trip and really kill the business out of Grand Rapids.

Right now you can take the train from Grand Rapids or Holland or St. Joe to Chicago, go shopping or take care of busines than take train back and do this in one day. If you re-route the train it will kill this day business and what woud you really gain?

User avatar
SD80MAC
Ingersoll's Mr. Michigan
Posts: 10665
Joined: Thu Mar 10, 2005 4:59 pm
Location: Grand Rapids

Re: New MDOT Rail Plan

Unread post by SD80MAC »

KenB wrote:Re-routing Amtrak from Grand Rapids to Kalamazoo thence to Chicago would be a very bad idea. Add a lot of time to the trip and really kill the business out of Grand Rapids.

Right now you can take the train from Grand Rapids or Holland or St. Joe to Chicago, go shopping or take care of busines than take train back and do this in one day. If you re-route the train it will kill this day business and what woud you really gain?
How would it really be any longer? If it started in Holland, went to GR then south to Kzoo, it could take advantage of the high speed running on the Amtrak owned MI Corridor west of there. Seems like it'd end up being around the same time to me.
"Remember, 4 mph is a couple, 5's a collision!"
http://flickriver.com/photos/conrail680 ... teresting/
Image

User avatar
~Z~
Sofa King Admin
Posts: 13153
Joined: Tue Oct 12, 2004 2:14 pm
Location: Grand Rapids, MI
Contact:

Re: New MDOT Rail Plan

Unread post by ~Z~ »

How about 2 Amtrak routes... GR to Kzoo then west... AND sort of keep the existing route, start in Holland and go south/west. Could leave Holland at 7:30am, get to Chicago earlier, and have a later departure out of Chicago to tie up at Holland's Waverly Yard at night. There's a wye within a mile of the Holland depot to turn the train around at night. People have complained of how late people arrive to Chicago from GR/Holland. Maybe have the GR train leave/arrive on a schedule opposite of the Holland train.

Of course this is an added expense and unlikely Amtrak will add a new route.
Webmaster
Railroad photos on Railroadfan.com

User avatar
SD80MAC
Ingersoll's Mr. Michigan
Posts: 10665
Joined: Thu Mar 10, 2005 4:59 pm
Location: Grand Rapids

Re: New MDOT Rail Plan

Unread post by SD80MAC »

Either way, the way they're building the new Amtrak station in GR doesn't work with any of these plans :roll:
"Remember, 4 mph is a couple, 5's a collision!"
http://flickriver.com/photos/conrail680 ... teresting/
Image

User avatar
Racer
Stops in Oncoming Traffic
Posts: 4365
Joined: Sun Sep 23, 2007 9:40 pm
Location: Livonia, MI

Re: New MDOT Rail Plan

Unread post by Racer »

Technically the new routing could be done. St. Joseph/ Benton Harbor is about a 35 minute drive from New Buffalo where the Michigan Line intersects with the GR Sub, same with Holland to Grand Rapids. The city of Grand Rapids could technically make money with buses from Holland to GR just for the Amtrak customers as a connecting service if it worked. If local citizens are against Amtrak's route change, why not conduct studies for GR's own "MI-Train" between GR and Benton Harbor? (I doubt it would happen, but thought I'd mention it.)


As for the signalling for the LSRC, I agree, too that it is completely pointless unless it's in Saginaw or Bay City because of the yards and junctions with HESR. Any signals on a shortline that runs a train (or 1 extra) a day is pointless except for approach signals into yards, Class 1 interchanges, or diamonds over other railroads. If a shortline has to make a rare meet with another train at a siding, that's what track warrants over the radio is for. Besides, doesn't LSRC already have 2 trains regularly meet somewhere on the old D&M to Grayling or something like that?
Last edited by Racer on Tue Jan 31, 2012 12:43 pm, edited 1 time in total.
"...and I was in the front and Matt grabbed and pulled my ears from behind me and made horsey sounds."

MSchwiebert
Railroadfan...fan
Posts: 1611
Joined: Mon Mar 20, 2006 1:43 pm
Location: Perrysburg Ohio

Re: New MDOT Rail Plan

Unread post by MSchwiebert »

I can't imagine the A&B getting a traffic source that would "need" to have the restoration of track and moving the interchange to Toledo. Not to mention how long it would take to recoup the investment.
jimnorthwood wrote:I didn't look at every link, but one long-term goal that caught my eye was to move the A&B interchange point from Adrian, to Toledo. I suspect this would involve the restoration of trackage from Riga to Ottawa Lake, with A&B to get trackage rights into Airline Yard. Interesting...

http://www.michigan.gov/mdot/0,1607,7-1 ... --,00.html

sd70accsxt700
Sofa King follower
Posts: 6159
Joined: Sat Apr 23, 2005 1:59 pm
Location: Toledo, OH.

Re: New MDOT Rail Plan

Unread post by sd70accsxt700 »

I would have to guess they want to resignal the Dean Sub back to Midland, seeing as how it hauls chemicals. It might even have to be done to be compliant with PTC, and its rules for hauling hazmat.
https://flic.kr/ps/jSuAb My Flickr photos!

User avatar
Saturnalia
Authority on Cat
Posts: 15451
Joined: Wed Sep 28, 2011 7:54 pm
Location: Michigan City, IN
Contact:

Re: New MDOT Rail Plan

Unread post by Saturnalia »

Here is a way to get a GR-Holland rail srvice going: Reabilitate the old Interurban! :mrgreen:
Signalling on the LSRC north of Pinconning is stupid,
I do see a Holland-GR-K-zoo-Chicago train working...interesting idea
Whatever they do to The PM, M<AKE IT LEAVE AT 6:30 or 6:45. 7:45 from GR? Thats not going to get your business day-trip to Chicago people. Case in point: my dad dosn't take Amtrak the Chicago because the train leaves to late: 7:45. He leaves earlier from GR, arriving around 3 hours ahead of P371. I think they should time a Holland-GR-K-zoo train to meet up with a wolverine train in K-zoo for a quick transfer. Then, the Pm, could go between K-zoo and GR twice each way....also, due to minor traffic on the GDLK, there should be few delays assuming the line is in good shape. In this case, a Holland-Michigan City train would make some sense, but again, time it with a wolverine.
Thornapple River Rail Series - YouTube
Safety today is your investment for tomorrow

KenB
Railroadfan...fan
Posts: 1505
Joined: Mon Apr 16, 2007 1:43 pm
Location: Dearborn, Mich.

Re: New MDOT Rail Plan

Unread post by KenB »

If you run a bus from Grand Rapids to Holland people would have to chage transportation modes and the delays. Runniag a train, GR to Holland and back makes no sence.
Yes, have the GR-Chicago train earlier but Holland-GR-K-zoo-Chicago?? Lot of time waisted.

User avatar
SD80MAC
Ingersoll's Mr. Michigan
Posts: 10665
Joined: Thu Mar 10, 2005 4:59 pm
Location: Grand Rapids

Re: New MDOT Rail Plan

Unread post by SD80MAC »

KenB wrote:If you run a bus from Grand Rapids to Holland people would have to chage transportation modes and the delays. Runniag a train, GR to Holland and back makes no sence.
Yes, have the GR-Chicago train earlier but Holland-GR-K-zoo-Chicago?? Lot of time waisted.
The goal is to get the train off of CSX and onto Amtrak owned rails for a good portion of the trip.
"Remember, 4 mph is a couple, 5's a collision!"
http://flickriver.com/photos/conrail680 ... teresting/
Image

User avatar
Michael
Stuck in mud
Posts: 11406
Joined: Sun Sep 12, 2010 2:52 pm
Location: Plymouth, Michigan

Re: New MDOT Rail Plan

Unread post by Michael »

What I think would be nice is if they restored AMTRAK service from Detroit to Toledo so that you could travel to the East Coast or down South without having to go all the way to Chicago and back.

Post Reply