Recently, as in the last few times I've gone towards Durand, I have noticed loads of pipes at Oak Grove along the GLC. I also noticed several cars in the Durand yard as well. I assume these cars are being handed off to the GLC from CN (via the HESR) and then are hauled down to Oak Grove for unloading. The field next to the tracks is loaded with pipes.
Does anyone know what project this is that is going on?
GLC Pipe Loads
Re: GLC Pipe Loads
Enbridge is rebuilding their pipeline. And you are correct about the pipes coming from the CN
Re: GLC Pipe Loads
I've heard that pipe for this project will also be staged in the CN Kilgore Yard in Kalamazoo.
- SD80MAC
- Ingersoll's Mr. Michigan
- Posts: 10699
- Joined: Thu Mar 10, 2005 4:59 pm
- Location: Grand Rapids
Re: GLC Pipe Loads
Indeed, that's one of the reasons CN is re-opening Kilgore as a "base" and the Kzoo job will start going on duty there.GAP wrote:I've heard that pipe for this project will also be staged in the CN Kilgore Yard in Kalamazoo.