I was in the UP. last weekend, when returning I went through Trout Lake & notised there was welded rail through town. Could someone tell me how fare the welded rail goes. Also along M28 the track lookes hump de doumty, is it class 1 or 2. Thank You.
-
- RedNeck Train Chaser
- Posts: 4149
- Joined: Sat Jul 30, 2005 8:42 pm
- Location: Buffalo Location
- Contact:
Re: Trout Lake
When I was be boping around that area two weekends ago they were doing spot work between Trout Lake and oh say Engadine or Gilchrist. I believe they are simply taking the worst spots of jointed on the line and putting welded rail in rather than just putting new sticks of jointed down. All along Trout Lake Rd/ Hiawatha Trail there were misc pieces of track equipment, this old WC crane at Gilchrist.
IMG_8777 by miketabone89, on Flickr
IMG_8776 by miketabone89, on Flickr
I also came across a speed swing, tie adizer, spiker, and tie changer along the way, although they were all curiously spread out with miles between them. There was also Ballast cars in the siding at Gilchrist.
IMG_8777 by miketabone89, on Flickr
IMG_8776 by miketabone89, on Flickr
I also came across a speed swing, tie adizer, spiker, and tie changer along the way, although they were all curiously spread out with miles between them. There was also Ballast cars in the siding at Gilchrist.
- Standard Railfan
- Railroadfan...fan
- Posts: 1824
- Joined: Wed Jan 18, 2012 7:25 pm
- Location: Marquette, MI
Re: Trout Lake
I don't know what class the track is on the Newberry sub (Trout Lake to Munising) any longer but the rate of travel is SLOOOOW. Maybe 10 mph.
I expect that CN will not improve this section until something goes bump in the night or the forest products business picks.
I expect that CN will not improve this section until something goes bump in the night or the forest products business picks.
Re: Trout Lake
I thought I heard that they laid some continuous welded rail on the Seney stretch last year.
- Standard Railfan
- Railroadfan...fan
- Posts: 1824
- Joined: Wed Jan 18, 2012 7:25 pm
- Location: Marquette, MI
Re: Trout Lake
I had not heard that. I wonder where. I will have to check that out.GAP wrote:I thought I heard that they laid some continuous welded rail on the Seney stretch last year.
There is an interesting feature of the old DSS&A track. Apparently when the line was last relaid, the rail chosen is of a non-standard web. Replacement rail is not available so the WC saved every decent piece of rail they pulled up on the South Shore. CWR would most likely be made from the rail in stock or welded in place.
- AARR
- Incognito and Irrelevant
- Posts: 39073
- Joined: Wed Dec 22, 2004 7:39 pm
- Location: Washington, MI
Re: Trout Lake
I heard CN did track work but I did not hear what that consisted of. I thought maybe just new ballast and ties but maybe they did lay new rail.GAP wrote:I thought I heard that they laid some continuous welded rail on the Seney stretch last year.
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...