CP sells major stake in Detroit River Tunnel

Anything pertaining to railfanning in Michigan.
rob
Railroadfan...fan
Posts: 311
Joined: Wed Nov 30, 2005 11:56 am
Location: grand Rapids

Re: CP sells major stake in Detroit River Tunnel

Unread post by rob »

because the tunnel is not a tunnel . it's was not bored but sunk . so they could only enlarge it so far. so autorack and some container was better then none.


rob

User avatar
AARR
Incognito and Irrelevant
Posts: 39073
Joined: Wed Dec 22, 2004 7:39 pm
Location: Washington, MI

Re: CP sells major stake in Detroit River Tunnel

Unread post by AARR »

rob wrote:because the tunnel is not a tunnel . it's was not bored but sunk . so they could only enlarge it so far. so autorack and some container was better then none.


rob
Thanks Rob
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...

OwlCaboose2853
Railroadfan...fan
Posts: 2176
Joined: Fri Dec 17, 2004 9:17 pm
Location: Chelsea

Re: CP sells major stake in Detroit River Tunnel

Unread post by OwlCaboose2853 »

rob wrote:because the tunnel is not a tunnel . it's was not bored but sunk . so they could only enlarge it so far. so autorack and some container was better then none.


rob
What about ties and ballasts remove drop about 15-25 inches in tunnel? Can rails stand with clamps on bottom of groove concrete in tunnel?
Last edited by OwlCaboose2853 on Tue Nov 24, 2009 12:02 pm, edited 1 time in total.
Amtrak Wolverines
NS Michigan Lines
Ann Arbor RR
The Monorail Society

Steven R. Williams

rob
Railroadfan...fan
Posts: 311
Joined: Wed Nov 30, 2005 11:56 am
Location: grand Rapids

Re: CP sells major stake in Detroit River Tunnel

Unread post by rob »

they put in steel ties durring the rebuild

Rob

OwlCaboose2853
Railroadfan...fan
Posts: 2176
Joined: Fri Dec 17, 2004 9:17 pm
Location: Chelsea

Re: CP sells major stake in Detroit River Tunnel

Unread post by OwlCaboose2853 »

rob wrote:they put in steel ties durring the rebuild

Rob
above or groove from surface?
Amtrak Wolverines
NS Michigan Lines
Ann Arbor RR
The Monorail Society

Steven R. Williams

CAT345C
RedNeck Train Chaser
Posts: 4149
Joined: Sat Jul 30, 2005 8:42 pm
Location: Buffalo Location
Contact:

Re: CP sells major stake in Detroit River Tunnel

Unread post by CAT345C »

The tube would mostlikey not support the rail be derectly attatched to it, the ties be it steel or wood distribute the weight of the trains, where as directly attatch would created a preasure point the width of the base of the rail, leading to a break down or cutting of the tube material. Cutting is a major problem if left un supervised, you can correct it by replacing a tie, but when you are unable to replace a tie you would eventualy have a weakened structure.
Making the railroad all Catywompus since 2008

https://www.flickr.com/gp/66353741@N07/02EZ1e

OwlCaboose2853
Railroadfan...fan
Posts: 2176
Joined: Fri Dec 17, 2004 9:17 pm
Location: Chelsea

Re: CP sells major stake in Detroit River Tunnel

Unread post by OwlCaboose2853 »

SMRGUY wrote:The tube would mostlikey not support the rail be derectly attatched to it, the ties be it steel or wood distribute the weight of the trains, where as directly attatch would created a preasure point the width of the base of the rail, leading to a break down or cutting of the tube material. Cutting is a major problem if left un supervised, you can correct it by replacing a tie, but when you are unable to replace a tie you would eventualy have a weakened structure.
Michigan Central Railway Tunnel http://en.wikipedia.org/wiki/Michigan_C ... way_Tunnel then sees photos in postcards... Can they make dig more down ground?

Why did CN make a bigger bored St. Clair Tunnel at Port Huron and Sarnia? Therefore, CN made succeed. Oh well, CP gave up Detroit River Tunnel... :?
Amtrak Wolverines
NS Michigan Lines
Ann Arbor RR
The Monorail Society

Steven R. Williams

User avatar
AARR
Incognito and Irrelevant
Posts: 39073
Joined: Wed Dec 22, 2004 7:39 pm
Location: Washington, MI

Re: CP sells major stake in Detroit River Tunnel

Unread post by AARR »

OwlCaboose2853 wrote:Michigan Central Railway Tunnel http://en.wikipedia.org/wiki/Michigan_C ... way_Tunnel then sees photos in postcards... Can they make dig more down ground?

Why did CN make a bigger bored St. Clair Tunnel at Port Huron and Sarnia? Therefore, CN made succeed. Oh well, CP gave up Detroit River Tunnel... :?
I think there could be some issues with the grade being too steep if they dig down further
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...

KenB
Railroadfan...fan
Posts: 1508
Joined: Mon Apr 16, 2007 1:43 pm
Location: Dearborn, Mich.

Re: CP sells major stake in Detroit River Tunnel

Unread post by KenB »

They can not dig deaper into the earth. As was posted earlier in this thread tunel was built of steel sections. Trench doug in river, srctions put in trench, covered over and cocnrete put inside.

CP enlarged the south tube (w.b. main) some years ago so this track can take international double-stack and hi-cube cars but not the 20"2" racks. A new tunnel would have to be built.

Canadian National dug a 22 foot tunnel useing a tunnel boring machine. This will clear domestic double stack and 20'2" racks and still have room for future electricication should it be economical.

A new Detroit River Tunnel would make sence since a new tunnel will last 100 years.

User avatar
AARR
Incognito and Irrelevant
Posts: 39073
Joined: Wed Dec 22, 2004 7:39 pm
Location: Washington, MI

Re: CP sells major stake in Detroit River Tunnel

Unread post by AARR »

KenB wrote:They can not dig deaper into the earth. As was posted earlier in this thread tunel was built of steel sections. Trench doug in river, srctions put in trench, covered over and cocnrete put inside.

CP enlarged the south tube (w.b. main) some years ago so this track can take international double-stack and hi-cube cars but not the 20"2" racks. A new tunnel would have to be built.

Canadian National dug a 22 foot tunnel useing a tunnel boring machine. This will clear domestic double stack and 20'2" racks and still have room for future electricication should it be economical.

A new Detroit River Tunnel would make sence since a new tunnel will last 100 years.
Ok - I understand now. Thanks Ken.
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...

Post Reply