Michigan Rail Business news
- Saturnalia
- Authority on Cat
- Posts: 15465
- Joined: Wed Sep 28, 2011 7:54 pm
- Location: Michigan City, IN
- Contact:
Re: Michigan Rail Business news
Padnos is also served at Front street and in holland
- SD80MAC
- Ingersoll's Mr. Michigan
- Posts: 10699
- Joined: Thu Mar 10, 2005 4:59 pm
- Location: Grand Rapids
Re: Michigan Rail Business news
Between the Holland location and both Grand Rapids locations, Padnos generates about 20-30 cars of various scrap per day for CSX.
"Remember, 4 mph is a couple, 5's a collision!"
http://flickriver.com/photos/conrail680 ... teresting/
http://flickriver.com/photos/conrail680 ... teresting/
- AARR
- Incognito and Irrelevant
- Posts: 39073
- Joined: Wed Dec 22, 2004 7:39 pm
- Location: Washington, MI
Re: Michigan Rail Business news
Padnos trucks in scrap metal from other locations to Grand Rapids and Holland for processing and loading into rail cars.SD80MAC wrote:Between the Holland location and both Grand Rapids locations, Padnos generates about 20-30 cars of various scrap per day for CSX.
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...
-
- i don't give a fark about your PM
- Posts: 3541
- Joined: Mon Sep 12, 2005 11:44 am
- Location: Columbus Ohio
- Contact:
Re: Michigan Rail Business news
This Magna Components facility in China Twp Is expanding and there are railroad tracks nearby
http://www.thetimesherald.com/article/2 ... ck_check=1
Appears to be the CSX St Clair Branch but there is no spur to the plant on Puttygut Road
https://www.google.com/maps/place/Magna ... bfe346ade7
http://www.thetimesherald.com/article/2 ... ck_check=1
Appears to be the CSX St Clair Branch but there is no spur to the plant on Puttygut Road
https://www.google.com/maps/place/Magna ... bfe346ade7
Exit stage left
- AARR
- Incognito and Irrelevant
- Posts: 39073
- Joined: Wed Dec 22, 2004 7:39 pm
- Location: Washington, MI
Re: Michigan Rail Business news
I am not aware of any Magna plants that ship by rail...at least in MIredside20 wrote:This Magna Components facility in China Twp Is expanding and there are railroad tracks nearby
http://www.thetimesherald.com/article/2 ... ck_check=1
Appears to be the CSX St Clair Branch but there is no spur to the plant on Puttygut Road
https://www.google.com/maps/place/Magna ... bfe346ade7
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...
-
- i don't give a fark about your PM
- Posts: 3541
- Joined: Mon Sep 12, 2005 11:44 am
- Location: Columbus Ohio
- Contact:
Re: Michigan Rail Business news
A WKW Roof Rail Systems plant is expanding in Battle Creek..
http://swmichigan.secondwavemedia.com/d ... -0619.aspx
There appears to be a spur nearby, but would it tie into this place?
https://www.google.com/maps/place/Battl ... e2cf0ff8b0
http://swmichigan.secondwavemedia.com/d ... -0619.aspx
There appears to be a spur nearby, but would it tie into this place?
https://www.google.com/maps/place/Battl ... e2cf0ff8b0
Exit stage left
- Standard Railfan
- Railroadfan...fan
- Posts: 1824
- Joined: Wed Jan 18, 2012 7:25 pm
- Location: Marquette, MI
Re: Michigan Rail Business news
New Customer for GLC.
According to reports in the local media, a new spur is being laid off the GLC in Mc Bain to serve the industrial park and Viking Energy. The news report indicate the Viking will begin receiving fuel shipments by rail. The first phase, which is not defined, is scheduled for completion at the end of 2014.
http://www.upnorthlive.com/news/story.a ... 6seBfmzHhw
According to reports in the local media, a new spur is being laid off the GLC in Mc Bain to serve the industrial park and Viking Energy. The news report indicate the Viking will begin receiving fuel shipments by rail. The first phase, which is not defined, is scheduled for completion at the end of 2014.
http://www.upnorthlive.com/news/story.a ... 6seBfmzHhw
Re: Michigan Rail Business news
They are they new customer already being served- the used ties are currently transloaded in Cadillac and trucked back to McBain.Standard Railfan wrote:New Customer for GLC.
According to reports in the local media, a new spur is being laid off the GLC in Mc Bain to serve the industrial park and Viking Energy. The news report indicate the Viking will begin receiving fuel shipments by rail. The first phase, which is not defined, is scheduled for completion at the end of 2014.
http://www.upnorthlive.com/news/story.a ... 6seBfmzHhw
CEO of the Waving Institute- teaching great wave forms.
- Standard Railfan
- Railroadfan...fan
- Posts: 1824
- Joined: Wed Jan 18, 2012 7:25 pm
- Location: Marquette, MI
Re: Michigan Rail Business news
Thanks for the update. I just noticed on AANScalerunner's update that used ties were headed into Cadillac and wondered if they were headed to Viking or to the plant in Cadillac.TC Man wrote:They are they new customer already being served- the used ties are currently transloaded in Cadillac and trucked back to McBain.Standard Railfan wrote:New Customer for GLC.
According to reports in the local media, a new spur is being laid off the GLC in Mc Bain to serve the industrial park and Viking Energy. The news report indicate the Viking will begin receiving fuel shipments by rail. The first phase, which is not defined, is scheduled for completion at the end of 2014.
http://www.upnorthlive.com/news/story.a ... 6seBfmzHhw
-
- Railroadfan...fan
- Posts: 2970
- Joined: Sun Jun 19, 2011 7:06 pm
- Location: Cadillac Michigan
Re: Michigan Rail Business news
The Cadillac News has a more in depth article on this. Mentions extending the spur even further into the industrial park and also a possible shared warehouse for companies who want shipments by rail.Standard Railfan wrote:New Customer for GLC.
According to reports in the local media, a new spur is being laid off the GLC in Mc Bain to serve the industrial park and Viking Energy. The news report indicate the Viking will begin receiving fuel shipments by rail. The first phase, which is not defined, is scheduled for completion at the end of 2014.
http://www.upnorthlive.com/news/story.a ... 6seBfmzHhw
- AARR
- Incognito and Irrelevant
- Posts: 39073
- Joined: Wed Dec 22, 2004 7:39 pm
- Location: Washington, MI
Re: Michigan Rail Business news
Inbound railroad ties have been very heavy. As many as 30-40 at a time. I don't know if it'll continue at this pace or not, though.
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...
Re: Michigan Rail Business news
It sounds like part of the Buick City property will be getting rail service right quick.
The link below takes you to an article about AmericanSpiralWeld, which is a company building water pipes (sounds like reloading to flat cars) on the site.
They say trains will begin operating to the location in the next 7-10 days. I am assuming these will just be cars on the Toledo-Flint train rather than a dedicated unit train, correct?
Maybe there could be some hope for rebuilding some rail use inside the Buick City property. There is a lot of space and rail access is available.
Does anyone know, is there still railroad track into the plant site, or has it been pulled up when the plant was torn down.
http://www.mlive.com/news/flint/index.s ... er_default
The link below takes you to an article about AmericanSpiralWeld, which is a company building water pipes (sounds like reloading to flat cars) on the site.
They say trains will begin operating to the location in the next 7-10 days. I am assuming these will just be cars on the Toledo-Flint train rather than a dedicated unit train, correct?
Maybe there could be some hope for rebuilding some rail use inside the Buick City property. There is a lot of space and rail access is available.
Does anyone know, is there still railroad track into the plant site, or has it been pulled up when the plant was torn down.
http://www.mlive.com/news/flint/index.s ... er_default
- Saturnalia
- Authority on Cat
- Posts: 15465
- Joined: Wed Sep 28, 2011 7:54 pm
- Location: Michigan City, IN
- Contact:
Re: Michigan Rail Business news
Based on satellite imagery the trackage in the old plant is largely inctact, though much of it might be cut-off...but that could be easily fixed.
Re: Michigan Rail Business news
I find it both amazing and sad that you have this huge plot of land that could be rebuilt and repurposed to provide jobs for hundreds to thousands of people, but yet nothing seems to be going on there until this relatively small project. I know there have been proposals for the land, but you would think this could be a prime industrial park type area which would bring in multiple employers to help an economically damaged area, yet nothing is being done.
What's really sad is the longer this area sits in Flint almost unused, the hard it will be to get people willing and able to fill the jobs that could be created.
What's really sad is the longer this area sits in Flint almost unused, the hard it will be to get people willing and able to fill the jobs that could be created.
-
- Railroadfan...fan
- Posts: 256
- Joined: Sun Feb 08, 2009 6:27 pm
Re: Michigan Rail Business news
chapmaja wrote:I find it both amazing and sad that you have this huge plot of land that could be rebuilt and repurposed to provide jobs for hundreds to thousands of people, but yet nothing seems to be going on there until this relatively small project. I know there have been proposals for the land, but you would think this could be a prime industrial park type area which would bring in multiple employers to help an economically damaged area, yet nothing is being done.
What's really sad is the longer this area sits in Flint almost unused, the hard it will be to get people willing and able to fill the jobs that could be created.
You have to take into account the liability still owned by GM, or old GM. There is bound to be contamination under any old auto plant. By law the "polluter" has to clean it up. There is a pile of politics that slow this down. Why would I build on top of this, and have someone come down the line in another 10 years, and say we are here to clean up, you will lose part of your parking lot at the very least for a month or two. Or, I will be affecting your operations while we perform remediation
-
- i don't give a fark about your PM
- Posts: 3541
- Joined: Mon Sep 12, 2005 11:44 am
- Location: Columbus Ohio
- Contact:
Re: Michigan Rail Business news
Automotive Supplier building two plants in Michigan..the possibility of rail service is questionable though...Although one of two facilities is going into a former GM Pontiac East Assembly Plant at 2100 South Opdyke Road.
http://www.mlive.com/business/west-mich ... cart_river
This is the Pontiac facility
https://www.google.com/maps/place/2100+ ... c8ab714f7f
http://www.mlive.com/business/west-mich ... cart_river
This is the Pontiac facility
https://www.google.com/maps/place/2100+ ... c8ab714f7f
Exit stage left
-
- i don't give a fark about your PM
- Posts: 3541
- Joined: Mon Sep 12, 2005 11:44 am
- Location: Columbus Ohio
- Contact:
Re: Michigan Rail Business news
I don't think this will translate to any more rail traffic but its worth a try for Michigan.
http://www.mlive.com/auto/index.ssf/201 ... cart_river
http://www.mlive.com/auto/index.ssf/201 ... cart_river
Exit stage left
-
- i don't give a fark about your PM
- Posts: 3541
- Joined: Mon Sep 12, 2005 11:44 am
- Location: Columbus Ohio
- Contact:
Re: Michigan Rail Business news
Big plans in the works for two GM plants around Lansing...The Grand River Plant is adding a stamping plant
http://www.mlive.com/lansing-news/index ... cart_river
More traffic for CN?
http://www.mlive.com/lansing-news/index ... cart_river
More traffic for CN?
Exit stage left
- AARR
- Incognito and Irrelevant
- Posts: 39073
- Joined: Wed Dec 22, 2004 7:39 pm
- Location: Washington, MI
Re: Michigan Rail Business news
I don't think anything from the stamping plant goes by rail. The only auto traffic handled by CN is outbound new vehicles from Rail Port. CSX doesn't handle any auto traffic from the Lansing area either, that I know of.redside20 wrote:Big plans in the works for two GM plants around Lansing...The Grand River Plant is adding a stamping plant
http://www.mlive.com/lansing-news/index ... cart_river
More traffic for CN?
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...
Re: Michigan Rail Business news
They are building the stamping plant so they won't have to ship stamps by rail rom another stamping plant.