New Control Point CP Indy at MP B501.5
Re: New Control Point CP Indy at MP B501.5
Thanks for the heads up; I will watch for any changes on ATCS. FYI, the crossing railroad is not IHB, but NS's SC&S IT (South Chicago and Southern Industrial Track [ex-PRR]).
Re: New Control Point CP Indy at MP B501.5
Burnham not up yet
Re: New Control Point CP Indy at MP B501.5
Thanks for the update.
Re: New Control Point CP Indy at MP B501.5
When operating trains through Pullman Jct., Milepost B 512.2, crews can traverse multiple route(s). This can include acquiring multiple signals in addition to operating hand operated switches within NS Pullman Jct.
To enhance operation through NS Pullman Jct the following instructions will apply. When multiple trains need route(s) through NS Pullman Jct, consideration must be taken on priority and routing of each train.
When a train is routed through NS Pullman Jct on the NS Main Line, all other cross traffic route(s) WILL NOT receive a signal indication until Main Line traffic clears Pullman Jct interlocking. Signal indications for route(s) other than Main Line will only be given once Main Line traffic has cleared the Pullman Jct Interlocking and route is lined for movement.
NS Operators are refrain from stacking signals for cross traffic prior to Main Line traffic clearing Pullman Jct interlocking. NS Operators must ensure prior to giving signal(s) or permission by signal(s), route(s) must be properly lined for the crew’s entire movement through the interlocking, including all hand operated switches within.
-----------
I knew Pullman was a messed up setup. But this has to take the cake.
To enhance operation through NS Pullman Jct the following instructions will apply. When multiple trains need route(s) through NS Pullman Jct, consideration must be taken on priority and routing of each train.
When a train is routed through NS Pullman Jct on the NS Main Line, all other cross traffic route(s) WILL NOT receive a signal indication until Main Line traffic clears Pullman Jct interlocking. Signal indications for route(s) other than Main Line will only be given once Main Line traffic has cleared the Pullman Jct Interlocking and route is lined for movement.
NS Operators are refrain from stacking signals for cross traffic prior to Main Line traffic clearing Pullman Jct interlocking. NS Operators must ensure prior to giving signal(s) or permission by signal(s), route(s) must be properly lined for the crew’s entire movement through the interlocking, including all hand operated switches within.
-----------
I knew Pullman was a messed up setup. But this has to take the cake.
Re: New Control Point CP Indy at MP B501.5
There is a CREATE project EW3 for Pullman Junction, but who knows when it will ever get funding.
Re: New Control Point CP Indy at MP B501.5
Pullman is weeeeeeird.
Its got four full on power switches.
its got three semi interlocked switches. In that the dispatcher locks and unlocks them and lines signals over them once the crewman lines the route (A VERY NKP THING)
Then there are two switches on the CSL and one from the NS connection that are completely non monitored.
Then the CSL diamond across the old NKP passenger lead is NOT interlocked.
Its got four full on power switches.
its got three semi interlocked switches. In that the dispatcher locks and unlocks them and lines signals over them once the crewman lines the route (A VERY NKP THING)
Then there are two switches on the CSL and one from the NS connection that are completely non monitored.
Then the CSL diamond across the old NKP passenger lead is NOT interlocked.
Re: New Control Point CP Indy at MP B501.5
and soon somebody in Atlanta will habdle this
Re: New Control Point CP Indy at MP B501.5
Well something is going on in the area. Spotted this on the ATCS forum
NS intermediate signal between 81st Street and Pullman Jct. (geographically, just east of the Dan Ryan between 90th and 91st Streets) is being replaced. When I was there (with authorization) a few days ago, the vertical was in place and the cross arm was lying on the ground near it. I suppose that soon after the new signals are in place and functioning, the old signal bridge which spans not only NS but also BRC will be removed. (It has no signals over the BRC tracks.)
NS intermediate signal between 81st Street and Pullman Jct. (geographically, just east of the Dan Ryan between 90th and 91st Streets) is being replaced. When I was there (with authorization) a few days ago, the vertical was in place and the cross arm was lying on the ground near it. I suppose that soon after the new signals are in place and functioning, the old signal bridge which spans not only NS but also BRC will be removed. (It has no signals over the BRC tracks.)
Re: New Control Point CP Indy at MP B501.5
I would presume that this work would just be to bring the signals up to current standards to support PTC.
Re: New Control Point CP Indy at MP B501.5
NS has a new interlocking running at 81st Street.
Re: New Control Point CP Indy at MP B501.5
I am seeing 75509210020202 with what appears to be 6 switches in a testing mode tonight (should be the NS Chicago District). I was first thinking that this could possibly be the NS view of BRC 80th Street, but 80th Street has 7 switches.
Has anyone heard of new NS changes?
Has anyone heard of new NS changes?
Re: New Control Point CP Indy at MP B501.5
Have they turned on Burnham?
Re: New Control Point CP Indy at MP B501.5
I have not noticed any changes. I did see some BCP activity there last night on the original address.
Re: New Control Point CP Indy at MP B501.5
Six would be right for the drawbridge.
Four derails and two switches.
My money is on Cummings Drawbridge.
Four derails and two switches.
My money is on Cummings Drawbridge.
Re: New Control Point CP Indy at MP B501.5
Good point - let's hope you are right.
Re: New Control Point CP Indy at MP B501.5
I am watching it now.
Judging from the way the controls are. 6 switches. One signal pair, 4 OOS bits. It is Cummings Drawbridge.
Judging from the way the controls are. 6 switches. One signal pair, 4 OOS bits. It is Cummings Drawbridge.
Re: New Control Point CP Indy at MP B501.5
So it's up and running already then? Nice.
Re: New Control Point CP Indy at MP B501.5
Yeah I have it mostly figured out.
Re: New Control Point CP Indy at MP B501.5
Awesome - thanks in advance for the help.
Re: New Control Point CP Indy at MP B501.5
And yet another drawbridge that acts in a different way.