The NS is replacing signals for their trackage through Delray. The Livernois Industrial, Old Main, and East and West Mains on the Boat Line have masts installed.
The searchlight and dwarf on the Boat Line will be gone, as well as the dwarf signal for Eastbounds on the Westbound Main.
The Conrail signals remain on the Detroit Line, and the CSX Tower, for now.
The searchlight and dwarf on the Boat Line will be gone, as well as the dwarf signal for Eastbounds on the Westbound Main.
The Conrail signals remain on the Detroit Line, and the CSX Tower, for now.
-
- Rock you like a Hurricane
- Posts: 1205
- Joined: Thu Apr 24, 2008 6:16 pm
- Location: Under a palm tree
Re: Delray Signal Replacements
No doubt part of the project to convert the interlocking to dispatcher control. End of the third quarter is what I am hearing, going to the RN.
Re: Delray Signal Replacements
New northbound signals are in on the Conrail side as well. They are way further back near the expressway overpass.
-
- Saver of all History
- Posts: 4987
- Joined: Wed Oct 27, 2004 10:35 pm
- Location: Feel the Zeel, MI
- Contact:
Re: Delray Signal Replacements
Interesting that the new CR northbound signals would be so much further from the diamond and crossing, shortening the already small block between Delray and the now-remote Bridge. Are any track layout changes planned? I wonder if they plan to install a crossover between the new northbound home signal and the Dearborn crossing?
On that subject, I wonder if the old NS eastbound main track is worth keeping From in front of the tower through the diamonds? Does anything even use this track anymore?
On that subject, I wonder if the old NS eastbound main track is worth keeping From in front of the tower through the diamonds? Does anything even use this track anymore?
-
- Railroadfan...fan
- Posts: 6025
- Joined: Sun Apr 29, 2007 10:04 pm
- Location: Detroit
Re: Delray Signal Replacements
A Northbound can crossover 2 to 1 at YD or 1 to 2 at the Conrail Bridge. A new crossover at Delray would not be necessary.GP30M4216 wrote: ↑Wed Sep 02, 2020 9:50 amInteresting that the new CR northbound signals would be so much further from the diamond and crossing, shortening the already small block between Delray and the now-remote Bridge. Are any track layout changes planned? I wonder if they plan to install a crossover between the new northbound home signal and the Dearborn crossing?
On that subject, I wonder if the old NS eastbound main track is worth keeping From in front of the tower through the diamonds? Does anything even use this track anymore?
Possibly BD-07 will use the Eastbound Main but likely not worth keeping anymore.
-
- Railroadfan...fan
- Posts: 6025
- Joined: Sun Apr 29, 2007 10:04 pm
- Location: Detroit
Re: Delray Signal Replacements
Detroit Line
Conrail Detroit Line Signal Replacements at Delray by tcamp7837, on Flickr
Boat Line
Boat Line Signal Replacements by tcamp7837, on Flickr
Construction
NS 121 & CSX Q131 at Delray by tcamp7837, on Flickr
Harbaugh St
Harbaugh St Gate Replacement by tcamp7837, on Flickr
Conrail Detroit Line Signal Replacements at Delray by tcamp7837, on Flickr
Boat Line
Boat Line Signal Replacements by tcamp7837, on Flickr
Construction
NS 121 & CSX Q131 at Delray by tcamp7837, on Flickr
Harbaugh St
Harbaugh St Gate Replacement by tcamp7837, on Flickr
Re: Delray Signal Replacements
Electronic bell not mounted at the top of the pole. Don't think I've ever seen it done that way before.
-
- The Beast
- Posts: 5934
- Joined: Fri Dec 08, 2006 1:28 pm
The End of Delray Tower
Might as well post it here in case anyone isnt aware, word on the street is signal cutover at Delray is November 17th, with control going that day from the tower to Jacksonville. Other reports say the operators might be on until springtime. In any case, the time is neigh for Michigan's last manned interlocking tower.
Re: Delray Signal Replacements
Delray is NOT the last maned interlocking tower. The last maned interlocking tower crown will go to the Short Cut bridge of the Delray Connecting RR.
The operator there controls the Short Cut draw bridge, the interlocking at CN BELANGER where the Conrail crosses the CN (ex-DT&I) now leased to the DCRR and the CN line from Great Lakes Ave to Zug Island under manual block.
While not maned 24, 7 anymore when the DCRR or CN have to go to/from island an operator is on duty. Latley the NS has been delivering coiled steel from Gary, Ind to the DCRR for them to take to Ecorse for finishing. At times CN has been taking coke off the island too.
The operator there controls the Short Cut draw bridge, the interlocking at CN BELANGER where the Conrail crosses the CN (ex-DT&I) now leased to the DCRR and the CN line from Great Lakes Ave to Zug Island under manual block.
While not maned 24, 7 anymore when the DCRR or CN have to go to/from island an operator is on duty. Latley the NS has been delivering coiled steel from Gary, Ind to the DCRR for them to take to Ecorse for finishing. At times CN has been taking coke off the island too.
- Saturnalia
- Authority on Cat
- Posts: 15462
- Joined: Wed Sep 28, 2011 7:54 pm
- Location: Michigan City, IN
- Contact:
Re: Delray Signal Replacements
I’ve been seeing more and more crossings done this way. My best guess is so that they are mounted lower to the ground and thus easier and safer for a signal maintainer to get to in case of failure.
Re: Delray Signal Replacements
There is one in Hope College in Holland, Michigan also
Ironically bad at Small Talk
Re: Delray Signal Replacements
Interesting that the new signal which is taller than the old one is closer to the freeway overpass making it more difficult to see the upper head when approaching it.
- M.D.Bentley
- Railroadfan...fan
- Posts: 2477
- Joined: Sat May 07, 2005 4:41 pm
- Location: Downriver
-
- Saver of all History
- Posts: 4987
- Joined: Wed Oct 27, 2004 10:35 pm
- Location: Feel the Zeel, MI
- Contact:
Re: Delray Signal Replacements
I hadn't thought about the maintenance factor, I figured it was a sound thing. Let's be honest, the new e-bells don't have the same intensity or volume as an actual mechanical bell. Placed up top of a taller crossbuck pole, the sound truly doesn't carry in the same way. I figured if mounted down lower, closer to eye - I mean ear - level, it would be more apparent. CSX has several new installations like this around West Michigan.Saturnalia wrote: ↑Tue Oct 27, 2020 12:48 pmI’ve been seeing more and more crossings done this way. My best guess is so that they are mounted lower to the ground and thus easier and safer for a signal maintainer to get to in case of failure.
Re: Delray Signal Replacements
Saturnalia is right, it’s much easier and safer for a maintainer to replace it when it is lower.