L'anse, Mich. question
-
- Railroadfan...fan
- Posts: 346
- Joined: Sun Jun 16, 2019 10:25 am
L'anse, Mich. question
According to Google maps, there are 2 separate ends of track in L'anse-- one on the old mainline, with a passing track, and one that branches off and crosses a main road, also with a passing track. Near the end of track, there is a switchback into Certainteed/ Celotex. How many car lengths are there on the tail of that switchback, as it seems rather short. Also-- did that switchback ever hook back into the old main track??
Re: L'anse, Mich. question
Yes at one time the tracks did join back up together. You can see for yourself by logging on to the Historic Aerials website. Click on the topo icon or the aerial icon from the 50s or 60s and that will show you everything you want to see.joeyuboats wrote: ↑Fri Mar 08, 2024 9:14 pmAccording to Google maps, there are 2 separate ends of track in L'anse-- one on the old mainline, with a passing track, and one that branches off and crosses a main road, also with a passing track. Near the end of track, there is a switchback into Certainteed/ Celotex. How many car lengths are there on the tail of that switchback, as it seems rather short. Also-- did that switchback ever hook back into the old main track??
https://www.historicaerials.com/viewer
-
- Railroadfan...fan
- Posts: 690
- Joined: Tue Aug 25, 2009 10:16 pm
Re: L'anse, Mich. question
me thinks you misspoke
I looked at the 1951 aerial and it doesn't show them connecting....plus with me driving in this area, the elevation change btw the mainline and the tail track for the industrial lead precludes any physical connection
I've been curious about how many cars they could handle on that tail track...of course, you wouldn't want too many cars as I know the grade going down into the industries is quite steep. I know during WC days, they would come up to Lanse with a single unit...but they weren't handling the amount of tonnage that CN does with todays' trains
I looked at the 1951 aerial and it doesn't show them connecting....plus with me driving in this area, the elevation change btw the mainline and the tail track for the industrial lead precludes any physical connection
I've been curious about how many cars they could handle on that tail track...of course, you wouldn't want too many cars as I know the grade going down into the industries is quite steep. I know during WC days, they would come up to Lanse with a single unit...but they weren't handling the amount of tonnage that CN does with todays' trains
Re: L'anse, Mich. question
I simply went by what the topographical map showed me. The map could be wrong which would make me wrong. You are correct I looked at the aerial photo and it shows no connection and I would trust the aerial photo before I would the map.Buster Manning wrote: ↑Tue Mar 12, 2024 11:18 amme thinks you misspoke
I looked at the 1951 aerial and it doesn't show them connecting....plus with me driving in this area, the elevation change btw the mainline and the tail track for the industrial lead precludes any physical connection
Edit: found a very good topographical map from 1975 and it definitely shows no connection so I was definitely wrong. Wrong wrong wrong wrong.
Last edited by GRHC on Tue Mar 12, 2024 5:07 pm, edited 2 times in total.
-
- Railroadfan...fan
- Posts: 690
- Joined: Tue Aug 25, 2009 10:16 pm
Re: L'anse, Mich. question
I tried using the topo portion of this area....for whatever reason the website didn't want to load a whole section of the map, specifically it would show what you posted ( and you can see the mainline below the red line--which is US-41) ...and you can see the contour line for an elevation change btw the mainline and the industrial trackage....some maps this line represents 10 ft......other maps it could be 100 ft., depending on the scale of the map
As someone who went to school for map making ( Ferris St. for photogrammetric mapping technology---a fancy term for making maps using aerial photos) it is a pet peeve of mine when maps aren't accurate...
As someone who went to school for map making ( Ferris St. for photogrammetric mapping technology---a fancy term for making maps using aerial photos) it is a pet peeve of mine when maps aren't accurate...
-
- Railroadfan...fan
- Posts: 346
- Joined: Sun Jun 16, 2019 10:25 am
Re: L'anse, Mich. question
OK, no problem-- so, those who live near there, or have seen the pocket of the switchback--- how many cars, or feet are there between the switch points, and the end of track??
Re: L'anse, Mich. question
I tried using the map that I have on my iPhone to get a good idea of how long that tail track is however I don’t know how accurate my measurements are. As I zoom the map in or out the scale changes so it’s kind of difficult but I would say it’s somewhere between 750 to 1000 feet long.joeyuboats wrote: ↑Tue Mar 12, 2024 3:15 pmOK, no problem-- so, those who live near there, or have seen the pocket of the switchback--- how many cars, or feet are there between the switch points, and the end of track??
These two screenshots are an example an example of what I mean.
Here’s a link to the topographical map shown in the screenshot sometimes it’ll come up as a 1975 version or come up as an updated map.
https://caltopo.com/map.html#ll=42.6514 ... 0&z=15&b=t
-
- Saver of all History
- Posts: 4993
- Joined: Wed Oct 27, 2004 10:35 pm
- Location: Feel the Zeel, MI
- Contact:
Re: L'anse, Mich. question
I did not know this was your educational skillset, Mr Buster! I may have to consult with you about future map related questions! Also, I share your pet peeve…Buster Manning wrote: ↑Tue Mar 12, 2024 12:27 pm
As someone who went to school for map making ( Ferris St. for photogrammetric mapping technology---a fancy term for making maps using aerial photos) it is a pet peeve of mine when maps aren't accurate...
Re: L'anse, Mich. question
if you use google maps measuring tool it looks to be about 460 feet using aerial image
-
- Railroadfan...fan
- Posts: 346
- Joined: Sun Jun 16, 2019 10:25 am
Re: L'anse, Mich. question
That's what I was looking for, THANKS GUYS!!
Re: L'anse, Mich. question
this showed up on my youtube recommendations last night
https://youtu.be/1VDwKVHN0QA
recap:
train arrived? and left inbounds on siding or main.
next day? engines ran around inbounds and went light engines down hill.
pulled outbounds and then shoved them back into other track up top.
pulled inbounds and then shoved then down the hill.
light engines went up hill and then backed onto outbounds.
train went on it's merry way.
https://youtu.be/1VDwKVHN0QA
recap:
train arrived? and left inbounds on siding or main.
next day? engines ran around inbounds and went light engines down hill.
pulled outbounds and then shoved them back into other track up top.
pulled inbounds and then shoved then down the hill.
light engines went up hill and then backed onto outbounds.
train went on it's merry way.
- AARR
- Incognito and Irrelevant
- Posts: 39023
- Joined: Wed Dec 22, 2004 7:39 pm
- Location: Washington, MI
Re: L'anse, Mich. question
Nancy does a good job videoing train activity in the L’Anse area. This video is typical of CN’s operations there.
DaveO wrote: ↑Tue Mar 19, 2024 8:22 amthis showed up on my youtube recommendations last night
https://youtu.be/1VDwKVHN0QA
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...
Re: L'anse, Mich. question
I was surprised at how it was done.AARR wrote: ↑Tue Mar 19, 2024 9:12 amNancy does a good job videoing train activity in the L’Anse area. This video is typical of CN’s operations there.DaveO wrote: ↑Tue Mar 19, 2024 8:22 amthis showed up on my youtube recommendations last night
https://youtu.be/1VDwKVHN0QA
But considering the track layout and the number of cars, it makes sense.
- AARR
- Incognito and Irrelevant
- Posts: 39023
- Joined: Wed Dec 22, 2004 7:39 pm
- Location: Washington, MI
Re: L'anse, Mich. question
I was surprised too. I expected them to go directly into the yard and not use the mainline past the yard switch. But as you rightly pointed out, it makes sense how they do it. But on those freezing days that back up move must be cold .
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...
-
- Railroadfan...fan
- Posts: 346
- Joined: Sun Jun 16, 2019 10:25 am
Re: L'anse, Mich. question
Does anyone know if CertanTeed-- or Koppers, has a trackmobile, or something to move cars? I ask because all of the vids show strings of cars being pulled out or pushed into this area, but yet nothing to show CN actually moving/ placing cars at CertainTeed, which would require a run around move, and a limited length switchback pocket.
- AARR
- Incognito and Irrelevant
- Posts: 39023
- Joined: Wed Dec 22, 2004 7:39 pm
- Location: Washington, MI
Re: L'anse, Mich. question
I suspect they do because it appears CN sets out and picks up in the yard and doesn’t move cars on the customers spurs.
joeyuboats wrote: ↑Tue Mar 19, 2024 11:16 amDoes anyone know if CertanTeed-- or Koppers, has a trackmobile, or something to move cars?
PatC created a monster, 'cause nobody wants to see Don Simon no more they want AARR I'm chopped liver, well if you want AARR this is what I'll give ya, bad humor mixed with irrelevant info that'll make you roll your eyes quicker than a ~Z~ banhammer...
-
- Railroadfan...fan
- Posts: 346
- Joined: Sun Jun 16, 2019 10:25 am
Re: L'anse, Mich. question
Thank you- I thought that might be what happens.